Cameron Dental Care is very proud to announce the start of operations in our brand new surgery room. The room used to be our old office/utility room. It was gutted and everything is now brand new.
Dr Steve did the painting and installed the LED light tubes after upgrading the fitting from two to five.
The electrics were done by Nelson Electrics. They have done lots of work for us before.
The plumbing was done by Doug Mills and his son Aaron. They were great. Nothing was too much trouble for them.
The cabinets were made by Bradbec Cabinets.
The Relative Analgesia equipment was supplied by AirLiquide.
The vinyl floor was laid by Wodonga Floorworld.
The dental chair was made by Planmeca in Finland and installed by Glen and Stuart from Henry Schein Halas Dental .They also installed the new intra oral Xray unit made in Finland also by Instrumentarium.
The sales consultant at Henry Schein was Yolanda Wang assisted by Rory Linnow.

Dr Sarah and Dr Sindhu are very proud to share the new facility.